About Ready Mix Plaster

Sunrise power plast RMP is single component ready to use material with filler and polymer additive, with (1:4) cement: sand ratio. Used for internal and external plaster work.


Area of Application

Sunrise power plast RMP can be used for plaster work on AAC, RCC (hacking or bonding agent required) on wall surface, it can also be used on concrete bock, fly ash bricks, red bricks, hollow blocks etc.


Features & Benefits

  • Used as replacement of traditional cement sand plaster for better results.
  • Highly durable.
  • Convenient to apply faster completion of work.
  • Consistant quality
  • Low rebound loss.
  • Better coverage.
  • Good finish

Method of Application

Surface Preparation
  • Prepare the surface before the application of sunrise power plast RMP by removing oil, inhibiting agents, dirt, dust.
  • CClean the surface following suitable methods like by using wire brush, water jetting, mopping, etc. Mixing

Mixing

  • Sunrise power plast RMP requires 16%-18% (6.4- 7.2 lit) potable water by weight of material.
  • Add Sunrise power plast RMP to the measured quantity of water, while continuously stirring using a mechanical, stirrer for 2-3 minutes to ensure a desired consistency and mix should be free of lumps.
  • Allow the mix to stand for 2 minutes to mature and then mix it again before use
  • Do not add more water to alter the mix consistency. Further water addition will hamper the adhesion strength of the RMP

Application

  • Apply the mixed sunrise power plast RMP to the prepared substrate using the appropriate trowel. Levelling work should be done before plastering.
  • Marking of 10-12mm thickness should be done, on substrate. For thickness above 15mm plastering work should be done in two layers.
  • If plastering is done on RCC member it is recommended before application wall should be moist and hacking as per IS requirement should be done or bonding agent should be applied 24 hr before application of RMP
  • On AAC wall, should be clean levelling should be done, no requirement of cement slurry on wall, as per thickness requirement paster work should be carried out.
  • For double coat plaster, there should be interval between first and second layer (min 1 day)

Technical data

Bulk density 1700-1800 kg/m³
Water powder ratio Approx. 16%-18% (6-7 lit)
Pot life 1 hr
Initial setting time 2 hr
Compressive strength @ 28 days 9-10 N/mm²
Pull-out @28 days Approx. 0.5 N/mm²
Thickness of layer Coverage 8-10mm19-20 sqft
Thickness of layer Coverage 10-12mm17-18 sqft
Thickness of layer Coverage 15-18 mm15-16 sqft
Thickness of layer Coverage 20-25 mm10-12 sqft
Water curing 2-3 days
Rebound loss Approx 1.5%
Finish Sponge/dabba

Material Specifications

M-sand 1.18 mm to 600 Micron
Primary Binder Cement
Pozzolanic Binder Fly Ash
Additives Polymer Powder
PP fibre 6 mm length

Precaution

  • Not suitable for application on cement sheet, plasterboard, plywood.
  • Not suitable for application on metal sheet or plastic substrates
  • Don't apply in direct sunlight

Note

  • Plastering work should be done at atmospher temperature.
  • Compressive, Pull-out strength depends upon site application and surface preparation
  • The data provided above is as per lab condition and may vary as per actual method of application on site
  • Trial should be conducted before application, consult Uditi Constrocare team for trail and technical assistance.
  • Coverage depends on surface and application

Packaging

40 kg PPE bag

Shelf Life

Sunrise power plast ready mix plaster has shelf life of 6 months from date of manufacturing

Specification

Technical parameters complies with IS 1661-1972, IS 2250-1965, IS 2402-1963.